So figured id rehash the topic of actaully doing some work this winter....hows everyone making out...any plans, projects or updates...
so far myself...
-turbo & piping is out...intercooler is marked up ready for a tweak....waiting on some hi-grade bolts for the exh flange....
-a/w heat protection box needs to be fab'd
-cold/ram air intake box needs to be fab'd
-going to rework the dp for better clearance & stealth
-started measuring for traction bar fabrication
-possible system re-design for a/w resivior & full stereo
-also order some new tires (m&h 235/60/15 drag radials....hook better than slicks as some say...hookinh 3rd dead on some 500whp setups) so hopefully ill have some traction w/ the new rubber & traction bars holding everything steady....then hopefully to 18-19psi for my dyno session...and ill be happy
so far myself...
-turbo & piping is out...intercooler is marked up ready for a tweak....waiting on some hi-grade bolts for the exh flange....
-a/w heat protection box needs to be fab'd
-cold/ram air intake box needs to be fab'd
-going to rework the dp for better clearance & stealth
-started measuring for traction bar fabrication
-possible system re-design for a/w resivior & full stereo
-also order some new tires (m&h 235/60/15 drag radials....hook better than slicks as some say...hookinh 3rd dead on some 500whp setups) so hopefully ill have some traction w/ the new rubber & traction bars holding everything steady....then hopefully to 18-19psi for my dyno session...and ill be happy